Contractors’ selection criteria for sustainable infrastructure delivery in Nigeria
Thesis
Authors | Arowosafe, O. |
---|---|
Qualification name | PhD |
Abstract | The research reported in this study developed and validated a framework for the pre-evaluation of contractors for sustainable infrastructure projects through Public-Private Partnership (PPP) in Nigeria. The proposed framework uses the Analytic Network Process (ANP) to select contractors for build-operate-transfer (BOT) contractors. Theoretically grounded on a system theory, a sustainable infrastructure delivery (SID) model is developed in this research. One of its important features is the ability to solve complex |
Keywords | Public-Private Partnership; Nigeria; public infrastructure |
Year | 2020 |
Publisher | University of Derby |
Web address (URL) | hdl:10545/625720 |
File | File Access Level Open |
File | File Access Level Open |
File | License File Access Level Open |
Output status | Unpublished |
Publication process dates | |
Deposited | 16 Apr 2021, 13:17 |
Publication dates | 2020 |
Contributors | Ceranic, Boris (Advisor) and Dean, Angela (Advisor) |
https://repository.derby.ac.uk/item/92z8w/contractors-selection-criteria-for-sustainable-infrastructure-delivery-in-nigeria
Download files
File
license.txt | ||
File access level: Open |
license_rdf | ||
File access level: Open |
FAO UDORA.pdf | ||
License: CC BY-NC-ND 4.0 | ||
File access level: Open |
120
total views178
total downloads1
views this month9
downloads this month