Different criteria by Using Engineering Economy techniques For Best Project Selection in one of the sector of telecommunication in Iran
Journal article
Authors | Mojahed, M. and Daniel, J. |
---|---|
Abstract | Selecting projects are an important problem, yet often difficult task. It is complicated because there is usually more than one dimension for measuring the impact of each project and especially when there is more than one decision maker. This paper considers a real application of project selection for Telecommunication projects with using the opinion of experts by one of the group decision making model, it is called TOPSIS method. There are four kinds of criteria that they are include qualitative, quantitative, negative and positive criteria have been considered and also one of them is engineering economy techniques that are included Net Present Value, Benefit-Cost Analysis, Rate of Return and Payback Period for selecting the best one amongst five projects and ranking them. By using AHP we found the weights of each engineering economy techniques out of 0.61 that we had defined before. [1, 6] We have also used from six expert’s opinion in Cable Network in Iran. Finally the introduced method is used in a case study (Telecommunication sector of Iran) and extracted results from it are analyzed from different points of view. |
Keywords | Group TOPSIS Method; MCDM; project selection |
Year | 2010 |
Journal | International Journal of Engineering and Technology |
Journal citation | 1 (2), pp. 1793-8236 |
Publisher | Science Publishing Corporation |
ISSN | 2227-524X |
Web address (URL) | https://papers.ssrn.com/sol3/papers.cfm?abstract_id=1724403 |
Output status | Published |
Publication dates | 2009 |
Publication process dates | |
Deposited | 17 Jun 2022 |
https://repository.derby.ac.uk/item/9731y/different-criteria-by-using-engineering-economy-techniques-for-best-project-selection-in-one-of-the-sector-of-telecommunication-in-iran
46
total views0
total downloads1
views this month0
downloads this month